Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2241

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 老外一级毛片免费看 | 免费观看色视频 | 日韩毛片视频 | 男人天堂综合网 | 午夜看黄 | 成人免费黄色片 | 欧美日韩在线免费看 | 青青视频网 | 日韩综合在线观看 | 日韩a无吗一区二区三区 | 亚洲欧美日韩精品久久 | 亚洲欧美另类在线 | 黄片一级毛片 | 日韩国产在线观看 | 国产免费啪视频观看网站 | 99在线免费视频 | 色视网站 | 精品第一国产综合精品蜜芽 | 成人国产精品一级毛片了 | 日韩国产另类 | 日日夜夜网 | 亚洲免费网址 | 精品伊人久久久久网站 | 日本欧美一二三区色视频 | 午夜不卡影院 | 黄色免费观看视频网站 | 侠盗高飞在线观看免费完整版 | 五月天在线网站 | 动漫精品午夜在线播放 | 综合精品视频 | 力王国语在线观看完整国语版免费 | 国内精品一区二区三区αv 国内精品一区二区三区 | 欧美日本一本线在线观看 | 国产网站麻豆精品视频 | 日本福利在线观看 | 四虎精品影院 | 精东传媒 果冻传媒 | 国产91激情对白露脸全程 | 免费高清视频日本 | 99re这里只有精品国产精品 | 六月婷婷综合激情 |