Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2546

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲国产三级在线观看 | 色综合久久久久久久久五月性色 | 91果冻制片厂天美传媒 | 99成人国产精品视频 | 亚洲成人免费 | 国产农村乱色xxxx | 亚洲每日更新 | 国产成人啪午夜精品网站 | 天堂日本| 女人高潮特级毛片 | 欧美成人动漫在线观看 | 国产免费av片在线观看 | 日日夜夜精品视频 | 视色网| 免费看一片| 国产精品小黄鸭一区二区三区 | 亚洲一区在线免费观看 | 国产精品一区在线观看 | 欧美日韩免费在线视频 | 成人黄色毛片 | 久久久不卡国产精品一区二区 | 99爱在线精品视频免费观看9 | 真实乱视频国产免费观看 | 日韩在线看免费高清完整版 | 精品一区二区三区四区五区 | 男女午夜特黄毛片免费 | 在线观看国产一区 | 麻豆视频免费在线 | 91麻豆精品国产剧情 | 国产日本欧美在线观看 | 中文字幕在线国产 | 精品国产品香蕉在线观看 | 色婷婷亚洲十月十月色天 | 中文字幕精品一区二区精品 | 国产伦| 这里只有精品免费视频 | 成年片黄大全 | 黑人又大又粗好爽好猛视频 | 99久久久久国产 | 香蕉色综合| 欧美视频免费播放 |