Steel structure warehouse hoisting process and hoisting plan-Chapter 1

Time:[2021-9-25]  Hits:2960

Hoisting process

 

Positioning --- Calibration Height --- Column Top Bolt Embedded --- Calibration Height - Elastic Line - Column Installation - Steel Beam Installation - Secondary Structure Installation --- --Welding----Repainting----Completion

 

 

Steel column installation process


A,Lifting of steel columns

 

1.Re-test the foundation, including the exposed length of the anchor bolt, the displacement deviation of the anchor bolt center line to the reference line, the distance between the anchor bolts, and the foundation elevation. The unqualified ones can be handled before lifting.

 

2.In order to control the installation elevation of the column, a 500mm position is also marked on the visible cross section of the column in advance for fine-tuning and correction of the elevation during installation. Install the steel column on the basis of qualified retest, first tie the column with a single steel wire rope, and choose the position of the lifting point at a position 1/3 of the length of the column from the end of the column. The column is lifted by the rotation method, and the steel column is lifted and sent to the installation position. The lashing place should be padded.

 

 

B, the correction of the steel column

 

1.Draw the center line in advance on the visible surface of the column, and then use the theodolite to adjust the verticality of the column in two mutually perpendicular directions.

 

2.Control the verticality of the column by measuring the distance between the inner side of the column and the control line on the building.

 

3.The adjustment of the elevation, axis and verticality deviation of the column are related to each other, and the correction work will be completed when all the standards are met.

 

 

Steel beam installation process

 

Unload the steel beams to the vicinity of each column, hoist them to the floor with a car, and then install them by mast cranes. The main beams with some heavy components can be platform craned with car cranes. The secondary beam can be installed with a self-made wheeled crane (5t). Starting from the third zone, the main girder, the secondary girder and then the purlin, the steel girder shall be hoisted by masts one by one according to the number. Only when the two ends of the girder are fastened with bolts (or spot welded firmly), the hooks can be loosened and the others are hoisted in sequence Steel beams. Weld after passing the inspection.
The lashing and hoisting points of steel beams are particularly important. Steel poles can be used when the steel beams are too long. There are many steel beams in this project with a maximum length of about 20m. A triangular hanging plate is used to enlarge the distance between the steel ropes to increase the angle of the steel ropes. Require. Schematic diagram of steel beam lashing.

 


Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 狠狠色狠狠色综合网 | 欧美激情一区 | 污视频网站在线观看免费 | 日韩精品中文字幕一区二区三区 | 国产精品入口牛牛影视 | 欧美成人777 | 在线观看91精品国产下载 | 在线观看 日韩 | 视色在线观看网站 | 成人aaa| 亚洲国产欧美精品一区二区三区 | 99视频国产热精品视频 | 色老头综合免费视频 | 亚洲国产精品91 | 国产成人精品亚洲一区 | 欧美人乱大交xxxxx | 国产一级自拍 | 国产精品亚洲欧美一区麻豆 | 男女男精品网站 | 99成人在线视频 | 91精品国产91久久久久 | 超91在线| 亚洲第一区第二区 | 四虎欧美在线观看免费 | 久久青青草原精品国产麻豆 | 久久精品美女视频 | www.av视频在线观看 | 日韩免费不卡视频 | 欧美日韩国产在线成人网 | 成人精品在线视频 | 91精品国产免费自在线观看 | 久草精品视频 | 年轻的馊子hd中文播放 | 四虎影视4hutv最新地址在线 | 亚洲欧美成人 | 依欧美视频 | 国产精品视频一区二区三区w | 中文字幕1区2区 | 四虎4hu永久免费国产精品 | 日韩国产成人精品视频 | 国产韩国精品一区二区三区久久 |