日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Installation details that must be paid attention to in steel structure processing
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2605

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本高清在线精品一区二区三区 | 中文字幕 在线观看 | 在线观看不卡视频 | 麻豆国内精品久久久久久 | 视频国产免费 | 麻豆爱爱 | 窝窝社区精品免费视频 | 99久久精品免费观看国产 | 国产麻豆网 | 久久综合免费视频 | 国产区最新 | 中文亚洲日韩欧美 | 国内精品视频在线播放一区 | 日产精品1卡二卡三卡乱码在线 | 插吧插吧综合网 | 久久99国产精品二区不卡 | 欧美一区二区手机在线观看视频 | 高清一区二区在线观看 | 亚洲一区在线免费观看 | 久久66热这里只会有精品 | 国产性生活视频 | 91视频综合网 | 日本高清免费中文字幕不卡 | 精品在线视频播放 | 欧美一级高清片免费一级 | 国产成人性色视频 | 日日夜夜天天人人 | 日本欧美一区二区 | 日本强日本不卡一 | 在线观看国产麻豆 | 欧美日本免费一区二区三区 | 日本不卡一 | 日韩伦理免费在线观看 | 欧美日韩在线观看区一二 | 干操网| 亚洲天堂自拍 | 亚洲国产精品欧美日韩一区二区 | 最新亚洲人成网站在线影院 | 国产精品久久久久影院色 | 五月婷色 | 日韩欧美亚洲每的更新在线 |