日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2962

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品嫩草研究院成人 | 久久这里只有精品99 | 成人免费福利片在线观看 | 久草免费网站 | 日韩在线视频免费观看 | 色综色天天综合网 | 亚洲欧洲尹人香蕉综合 | 免费观看动漫的网站 | 欧美第六页 | 青青射| 精品卡一卡2卡三卡免费 | 暴雨夜被公侵犯078在线观看 | 五月天六月婷婷开心激情 | 欧美又粗又长 | 一本久道久久综合中文字幕 | 四虎影院2022 | 99热2| 四虎4hu新地址入口 四虎4h | 日本在线视频不卡 | 黑人精品 | 国产国语一级毛片在线视频 | 久久窝窝国产精品午夜看15 | 在线视频三区 | 污网站免费观看污网站 | 成年女人毛片免费观看97 | 亚洲人av高清无码 | 成年黄网站在线观看免费 | 欧美黑寡妇高清一级在线观看 | 欧美日韩视频在线成人 | 欧美自拍三级 | 成人午夜视频免费看欧美 | 沈樵数学老师hd在线观看 | 国产一区二区三区日韩欧美 | 四虎aⅴ | 91video| 睡美人免费观看完整版韩国 | 青青青爽国产在线视频 | 狠狠色丁香婷婷综合激情 | 窝窝影院午夜色在线视频 | www狠狠| 亚洲动漫在线观看 |