Analysis of key construction points of steel column and frame beam of high-rise steel structure

Time:[2021-8-25]  Hits:2402

Analysis of key construction points of steel column and frame beam of high-rise steel structure

1、 Analysis on key points of steel column construction of high-rise steel structure

Steel column is a vertical component that determines the floor height and the total height of the building, and its fabrication and processing needs to meet the corresponding specifications and standards. At the same time, the shrinkage deformation of the weld and the compression deformation caused by the vertical load need to be considered in the process of turning and blanking. Therefore, the turning and blanking length of the steel column is not equal to the design length, even if it is only a few millimeters, it can not be ignored. Moreover, when the sections of the upper and lower steel columns are completely equal, they are not allowed to be interchanged. It is required that each steel column shall be numbered differently and installed in place correctly. The welding of stiffener plate in rectangular or square steel column shall adopt nozzle electroslag welding according to the requirements of current specifications, and other forms such as opening on box plate and slot plug welding are not allowed.

2、 Analysis on key construction points of high-rise steel structure frame beam

In order to ensure that the joint area at the connection between the frame beam and the steel column has good ductility, connection reliability and floor height accuracy, during factory manufacturing, a cantilever beam (short corbel) is set at the position where the frame beam is located. The connection between the upper and lower flanges of the cantilever beam and the steel column adopts cut penetration weld, and the web adopts fillet weld. The frame beam is connected with the cantilever beam (short corbel) of the steel column, the upper and lower flanges are connected by the full penetration weld of the lining plate (also the arc striking plate), and the web is connected by high-strength bolts. Since the allowable deviation of reinforced concrete construction is far greater than the accuracy requirements of steel structure, when the frame beam is connected with reinforced concrete shear wall or reinforced concrete cylinder wall, the connecting plate of web can be opened with elliptical holes, which shall meet the requirements of hole edge distance. The blanking length of frame beam is also not equal to the design length, and the welding shrinkage deformation shall be considered. The welding shrinkage deformation can be calculated by empirical formula, and then checked according to the actual processing, so as to determine the exact length of the turning and blanking. High strength bolt connection or welding connection can be adopted for the connection of the upper and lower flanges of the frame beam. At present, most of them adopt full penetration welding connection with lining plate. During construction, the lower flange shall be welded first, and then the upper flange shall be welded. One end shall be spot welded for positioning, and then the other end shall be welded. The web is connected with high-strength bolts. It is necessary to fully understand whether friction type or pressure bearing type high-strength bolts are used in the design. The friction coefficient of friction type high-strength bolt should be selected reasonably. When using high-strength bolt group connection, the accuracy of hole position is very important. At present, template drilling and multi axis NC drilling are generally used for hole making. The former has low precision and the latter has high precision, so the latter should be given priority. When the formwork is used to make holes, the accuracy of the formwork shall be ensured to ensure the accuracy requirements of the assembly holes of high-strength bolts and site installation holes. In case of local deviation of hole position, reaming with reamer is only allowed. It is strictly prohibited to use gas cutting for hole expansion. If gas cutting is used for hole expansion, it shall be handled as a major quality accident.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 久久99精品久久久久久野外 | 一级成人a做片免费 | 亚洲第一人黄所 | 国产精品久久久久久一级毛片 | 五月欧美激激激综合网色播 | 日日日射射射 | 日韩精品久久一区二区三区 | 母性本能| 999成人国产精品 | 岛国在线视频 | 国产一区欧美二区 | 精品推荐国产麻豆剧传媒 | 奇米影视7777久久精品 | 久久久精品日本一区二区三区 | 国产精品免费看久久久香蕉 | 久久伊人最新 | 高清在线一区 | 免费特级毛片 | 91国偷自产一区二区三区蜜臀 | 欧美日韩色黄大片在线视频 | 日本在线观看视频网站 | 欧美国产日韩一区二区三区 | 亚洲91精品麻豆国产系列在线 | 日本成人免费在线 | 四虎影视8848a四虎在线播放 | 亚洲国产成人欧美激情 | 91福利国产在线观看一区二区 | young sheldon| 日韩在线一区二区三区免费视频 | 永久在线观看www免费视频 | 99精品国产综合久久久久五月天 | 老子影院午夜理伦手机不卡 | 天天se天天cao综合网蜜芽 | 在线播放国产区 | 18到20女人一级毛片 | 日本不卡二卡三卡四卡无卡免费 | 99热成人精品热久久669 | 久久精品国内偷自一区 | 在线日韩欧美一区二区三区 | 手机看片日韩日韩国产在线看 | 不卡视频在线 |