日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3321

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 激情视频网站在线观看 | 毛片网站在线播放 | 国产精品自线在线播放 | 亚洲国产精 | 人成在线免费视频 | 欧美精品一区二区三区观 | 欧美大片在线观看完整版 | 亚洲免费高清 | 四虎网址在线 | 男女视频免费网站 | 亚洲已满18点击进入在线观看 | 久久精品韩国日本国产 | 五月激情婷婷网 | 免费人成黄页在线观看1024 | 亚洲男人的天堂久久无 | 国产精品成人久久久久 | 日韩黄网| 久久精品国产99国产精品 | 天堂网在线资源 | 三级 在线播放 | 欧美日韩一区二区高清视 | 青久久| 精品视频网站 | 日韩精品视频免费观看 | 高清欧美一区二区三区 | 91视频 - 88av | 欧美成人hd | 亚洲一区二区三区深夜天堂 | 8848com四虎 | 成 人 色综合 | 99爱这里只有精品 | 美女免费视频一区二区 | 国产有码在线 | 69国产| 天天操天| 欧美久操| 国模福利在线观看视频 | 五月婷婷伊人 | aa国产| 亚洲国产精品自产在线播放 | 青青青春在线观看免费2019 |