日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Common problems of Foshan steel structure column base installation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Common problems of Foshan steel structure column base installation

Time:[2021-4-7]  Hits:3009

Installation of column base

 

(1) Embedded parts (anchor bolt) problems: overall or layout deviation; elevation error; screw thread without protective measures. The bolt holes on the bottom plate of the steel column are directly out of alignment, resulting in insufficient thread length.

 

Measures: the steel structure construction unit cooperates with the civil construction unit to complete the embedded parts work, before the concrete pouring and tamping. Relevant dimensions must be rechecked and fixed firmly.

 

(2) The phenomenon of anchor bolt not vertical: the horizontal degree of the base plate of frame column column foot is poor, the anchor bolt is not vertical, and the horizontal error of embedded anchor bolt is too large after foundation construction. The columns are not in a straight line after installation, which makes the appearance of the house difficult to see, brings errors to the steel column installation, and affects the structural stress, which does not meet the requirements of the construction acceptance specification.

 

Measures: the anchor bolt installation should adhere to the bottom plate leveling with the lower adjustment bolt, and then the secondary grouting of non shrinkage mortar, and the construction method abroad. Therefore, during the construction of anchor bolt, steel bar or angle steel can be used to fix anchor bolt. Welding into a cage, improving the support, or taking some other effective measures to avoid the anchor bolt moving one place when pouring the foundation concrete.

 

(3) Anchor bolt connection problems: the anchor bolt of column base is not tightened, the base plate is not welded with the bottom plate; some anchor bolts with 2-3 threads are not exposed.

 

Measures: Welding bolts and nuts shall be adopted; outside chemical anchor bolts, fire-proof coating and heat insulation treatment shall be added to prevent the anchorage performance from being affected by fire; observation data of foundation settlement shall be supplemented.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 日韩每日更新 | 成人一区二区丝袜美腿 | 九九免费在线视频 | 欧美在线观看网站 | 91午夜激情| 欧美日韩一区二区三区视频 | 欧美精品一区二区三区免费 | 午夜黄色在线观看 | 欧美一级黄色片 | 久插视频| 一级毛片免费全部播放 | 精品国产国产综合精品 | 亚洲成人福利 | 欧美国产伦久久久久 | 亚洲一级片网站 | 日本在线高清不卡 | 亚洲国产美女精品久久久久 | 欧美国产在线看 | 欧美高清一区二区三 | 久久国产精品久久精品国产 | 四虎免费大片aⅴ入口 | 天堂亚洲欧美日韩一区二区 | 国产四虎免费精品视频 | 免费高清资源黄网站在线观看 | 国产污污视频 | 精品在线免费视频 | 在线观看高清免费理论片 | 久久老司机 | 日韩欧美中文字幕一区二区三区 | 欧美 日韩 亚洲另类专区 | 国产精品国产三级国产普通 | 欧美曰逼视频 | 热99re久久精品这里都是免费 | 国产亚洲欧美日韩在线观看不卡 | 免费一级毛片无毒不卡 | 国产九九在线 | 亚洲视频在线观看 | 曰本人一级毛片免费完整视频 | 97在线亚洲| 热99re久久免费视精品频软件 | 国产69精品久久久久999小说 |