日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > What should be paid attention to when using steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

What should be paid attention to when using steel structure?

Time:[2020-11-23]  Hits:3365

With the rapid development of workshop in our country, the application of steel structure is more and more widely. As we all know, the use of steel structure is very important to the construction of the factory. Therefore, in order to ensure the safe use of steel structure, we must pay attention to the following matters in the process of storage and installation.

1. The steel end shall be marked with steel specification, steel grade, quantity and material acceptance certificate number;

2. When stacking in the open air, the site should be flat, higher than the surrounding ground, and drainage ditches should be set around;

3. When stacking, the profile back should be upward or outward as far as possible to prevent snow and ponding, and there should be height difference at both ends to facilitate drainage;

4. Before installation, the construction unit shall conduct special inspection on the product certificate, design documents and pre assembly records of components, and record the component size;

5. The steel structure should be connected reasonably to make the joint design consistent with the simplified structural calculation model;

6 appropriate measures shall be taken to prevent excessive bending and torsion deformation during hoisting of steel structure. At the same time, a cushion block should be added at the contact between the buckle and the component to prevent damage to the component;

7. After the steel structure is hoisted in place, the support and other connecting components should be tightened in time to ensure the stability of the structure;

8. Whe using tools, aerial operators should put spare parts into tool bags instead of throwing them up and down;

9. When working in rainy days, reliable anti-skid measures must be taken, and attention should be paid to lightning protection in thunderstorm season;

Before the construction, the weather conditions should be optimistic, and the operation is strictly prohibited when the wind is above level 4.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩精品视频在线 | 欧美在线精品一区二区三区 | 不卡在线视频 | chainaxxxtube8 | 国内精品一级毛片免费看 | 色婷婷社区 | 日韩在线二区全免费 | 免费国产午夜高清在线视频 | 女人18特级一级毛片免费视频 | 日韩美女视频在线观看 | 久久91这里精品国产2020 | 青青草华人在线 | 成人a级特黄毛片 | 伊人久久综合热青草 | 一级毛片在线播放免费 | 精品久久久久久久久久香蕉 | 亚欧在线 | 亚洲视频在线免费观看 | 一区二区日韩精品中文字幕 | 欧美一级在线 | 精品区卡一卡2卡三免费 | 精品99在线观看 | 日韩日韩日韩日韩 | 国产一区二区三区四卡 | 蜜桃五月天 | 国产三级精品三级在线观看 | 热re久久精品国产99热 | 一区二区三区国产精品 | 精品在线视频免费 | 2021色噜噜狠狠综曰曰曰 | 成年男女免费视频网站 | 日日操夜夜操视频 | 麻豆日韩国产精品欧美在线 | 国产精品麻豆一区二区三区 | 久久66热re国产毛片基地 | 日韩五月天 | 国产一卡2卡3卡4卡公司在线 | 久久国产精品国语对白 | 99re这里都是精品 | 日产精品1卡二卡三卡乱码在线 | 玖玖精品视频在线观看 |