日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Project cost control for wholesale metal building systems
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:3550

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧美日韩国产一区二区三区伦 | 国产日本欧美亚洲精品视 | 青青青草视频在线观看 | 非洲黑人高清一级毛片 | 97视频免费观看 | 香蕉草莓丝瓜茄子番茄绿巨人 | 国产午夜精品免费一二区 | 老师的兔子又大又好吃又多 | 久草青青| 草逼视频网址 | 日韩一级在线播放免费观看 | 欧美3p在线观看一区二区三区 | 国产日韩精品一区二区在线观看 | 国产99视频精品免视看9 | 杰罗德游戏在线观看完整版免费 | 精品视频一区二区三区在线播放 | 一二三四社区在线视频社区3 | 亚洲 武侠 欧美 自拍 校园 | 日韩片在线观看 | 中国黄色一级视频 | 四虎永久在线精品视频播放 | 欧美白虎逼 | 亚洲免费三区 | 色婷婷影院在线视频免费播放 | 亚洲丰满熟妇毛片在线播放 | 中文字幕一区二区在线视频 | 国产精彩对白综合视频 | 精品国产人成亚洲区 | 99re最新地址获取精品 | 国内精品在线观看视频 | 国产精品嫩模在线播放 | 久久久久久久99精品免费观看 | 四虎网站网址 | 99综合在线 | 亚洲高清一区二区三区 | 69视频在线是免费观看 | 天天艹日日干 | 欧美中文在线 | 欧美另类videos高清精品 | 国产亚洲高清在线精品不卡 | 91在线精品 |