日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Cost control in the design stage of steel structure building
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.sowiz.com.cn

Cost control in the design stage of steel structure building

Time:[2020-10-13]  Hits:3580

Engineering cost control in material selection

 

As my country's steel production continues to increase year by year, steel varieties tend to diversify. Various new building materials, such as lightweight thermal insulation wall panels, color-coated profiled steel plates, floor decks, etc., have been continuously developed and promoted. Building steel structures have more room for material selection in the design stage. The choice of materials is different, the direct cost of the project is different, and the total cost is different. Reasonable selection of building materials in the design stage and control of the unit price of materials or engineering quantities are effective ways to control the project cost.

 

 

Many, high-rise steel structure building (roof) floor deck: in design, according to the role in the building (roof) structure system, the floor deck can take two forms, namely ① the floor deck is only permanent The formwork generally adopts ordinary galvanized profiled steel plate, which has lower requirements for minimum galvanizing amount and fire resistance time, and is relatively cheap; ②As a formwork during construction, it replaces the tensioned steel bars in the use stage, that is, composite floor slabs. Since the floor deck is considered as a tension bar in the design, its service life must be consistent with the service life of the main steel structure, so its minimum galvanizing amount and fire resistance time are relatively high, and the unilateral price is relatively high.

 

 

Steel specifications and materials: Due to the increase in steel varieties, there are more types of components available for structural design. For example, frame columns can adopt hot-rolled H-beams, welded H-beams, spiral welded round steel pipes, welded square steel pipes, and combined cross-sections, and steel beams can take forms such as equal cross-sections and variable cross-sections. The material can be Q235 plain carbon steel or Q345 low alloy steel. High-strength materials should be used as much as possible in the design. For example, the use of Q345 steel can save 15%-25% of steel than the use of Q235 steel, and the saving ratio for tensile or bending components is larger. When designing, choose economical cross-section steel, such as hot-rolled H-section steel, T-section steel, etc. In some cases, the use of hot-rolled H-section steel columns and beams may use slightly more steel than the use of welded H-section steel. However, considering the processing cost and construction schedule, the cost may be more advantageous.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 在线免费观看欧美大片 | 国产成人精品久久二区二区 | 国产99视频精品免费视频免里 | 久草中文在线视频 | 青青草色久综合网 | 亚洲国产高清人在线 | 国产高清国内精品福利色噜噜 | 自拍视频在线观看完整版 | 日韩精品免费一区二区三区 | 91在线免费公开视频 | 四虎影视成人永久在线观看 | 最新欧美在线 | 免费aⅴ片| 国产成人麻豆tv在线观看 | 综合插插插 | 国产 欧美 日韩在线 | 国产成人性毛片aaww | 国产黄色小视频 | 亚洲欧美综合久久 | 肉与灵电视剧在线观看 | 天美传媒精品 | 麻豆精品国产 | 成人午夜网 | 2022av视频| 日韩精品欧美精品中文精品 | 国产在线成人一区二区 | 妈妈的朋友手机在线观看 | 欧美精品久久一区二区三区 | 999国产精品999久久久久久 | 99精品视频免费观看 | 九九色播 | 九九欧美 | 在线中文字幕第一页 | 国产精品福利一区二区亚瑟 | 精品卡1卡2卡三卡免费网站 | 两个人免费看 | 国产不卡精品一区二区三区 | 欧美日韩免费播放一区二区 | 久久精品成人一区二区三区 | 在线视频这里只有精品 | 激情国产视频 |