Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4796

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 天堂а在线地址8最新版 | 天堂日本 | 欧美特级视频 | 一级一片免费看 | 国内免费一区二区三区视频 | 欧美视频免费在线观看 | 精品欧美一区二区三区免费观看 | 亚洲成年人专区 | 日本不卡高清中文字幕免费 | 四虎永久在线精品免费影视 | 久久久久国产精品 | 国产黄a三级三级三级 | 深爱激情婷婷 | 99热在线国产 | 九一国产精品 | 日本中文字幕在线观看 | 就色干综合 | 国产欧美在线观看精品一区二区 | 日本久色| 国产精品欧美一区二区三区不卡 | 在线播放亚洲精品 | 爽躁多水快深点小说妇 | 神马我不卡影视 | 亚洲欧美日韩在线观看二区 | 国产免费播放一区二区 | 日韩精品视频免费网址 | 天堂综合网 | 四虎成人精品 | 亚洲精品毛片久久久久久久 | 国产手机在线小视频免费观看 | 欧美一级免费 | 啦啦啦社区手机在线视频免费视频 | 日日噜| 国语精品91自产拍在线观看二区 | 美女国内精品自产拍在线播放 | 四虎精品成在线播放 | 精品国产免费一区二区三区 | 国产无限免费观看黄网站 | 国模青青 | 草莓视频无限频下载-丝瓜视 | 四虎影院在线观看免费 |