Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:5076

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一区二区三区四区在线免费观看 | 国产激情久久久久影 | 午夜色在线| 欧美激情一区二区三区在线 | 亚洲专区在线 | 窝窝午夜一级看片爽 | 99视频精品全部在线播放 | 天堂 在线最新版在线 | 欧美性精品不卡在线观看 | 看全大色黄大色黄大片一级爽 | 再次拥抱阳光漫画免费下拉式观看 | 九九热在线视频观看 | 免费国产一级特黄aa大 | 日韩免费一级片 | 99这里只有精品6 | 国产欧美第一页 | 日韩在线免费看网站 | 91免费国产高清在线 | aaa大片 | 亚洲激情区 | 国产成人精品影视 | 日本精品一区二区三区视频 | 天天上天天操 | 久久国产精品久久国产片 | a毛片免费视频 | 久久久精品免费国产四虎 | 色综色天天综合网 | 欧美日韩 在线播放 | 日韩一区精品 | 日韩一区二区精品久久高清 | 国内毛片视频 | 四虎最新永久免费网址 | 不卡一级毛片免费高清 | www.久草| 羞羞网站免费观看 | 免费一级片观看 | 日本一区二区三区精品 | 欧美国产日韩在线观看 | 久久久国产精品va麻豆 | 国产夜色视频 | 找国产毛片看 |