Foshan main steel members (b)

Time:[2016-5-14]  Hits:5406

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91精品久久久久久久久中文字幕 | 日韩欧美1区 | 亭亭色 | 成人午夜性影院视频 | 日韩色视频一区二区三区亚洲 | 亚洲人妖ts资源在线观看 | 四虎永久影院永久影库 | 亚洲精品国产三级在线观看 | 91牛牛| 天天干天天操天天玩 | 色婷五月天 | www.日本在线| 亚洲岛国 | 久久久久国产 | 亚洲国语在线视频手机在线 | 国产在线精品福利一区二区三区 | 一个人www免费观看视频 | 四虎网站在线播放 | 五月天精品在线 | 一级特黄视频 | 日韩精品一区二区三区免费观看 | 干干操| 亚洲一区二区三区四区在线 | 亚洲一区中文字幕 | 精品在线免费观看 | 精品在线91 | 日本欧美大码a在线视频播放 | 精品日产一卡2卡三卡4卡在线 | 国产亚洲玖玖玖在线观看 | 免费高清在线影片一区 | 国产精自产拍久久久久久 | 99久久精品国产一区二区三区 | 精品57页国产100页 | 国产成人高清亚洲一区久久 | 欧美在线视频一区 | 日本福利在线观看 | 日本色视 | 毛片女人毛片一级毛片毛片 | 黄色的网站免费 | 韩国福利在线观看 | 欧美午夜视频在线观看 |