日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > raw materials and finished steel structure approach
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.sowiz.com.cn

raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5022

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日韩在线免费观看视频 | 免费黄色在线播放 | 日韩色网 | 激情综合六月 | 91精品国产高清在线入口 | 综合网在线视频 | 国产黄色免费观看 | 国产精品麻豆99久久 | 欧美视频在线免费看 | 亚洲干综合 | 成人网视频在线观看免费 | 免费看黄的视频网站 | 日本免费黄色网 | 成人羞羞视频在线观看免费 | 欧美成网| 国产免费久久精品久久久 | 日韩欧美一区二区三区在线观看 | 亚洲一区欧美日韩 | 久久这里有精品 | 国产一区二区三区在线观看精品 | 97精品国产高清在线看入口 | 色视频国产 | 国产日韩欧美一区二区三区综合 | 特毛片| 免费在线观看黄色的网站 | 国产欧美一区二区三区在线 | 欧美一区综合 | 国产对白精品刺激一区二区 | 最近免费中文字幕视频高清在线看 | 精彩视频一区二区三区 | 一级毛片免费毛片毛片 | 免费观看大片毛片 | 91久久夜色精品国产九色 | 向日葵app在线观看 向日葵app看片视频在线观看 | 四虎永久影院 | 久久免费看片 | 伊人干 | 三a级毛片| 玖玖成人| 亚洲欧美在线不卡 | 91午夜精品午夜剧场 |