日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.sowiz.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5664

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美第一色 | 免费h福利动漫网站在线 | 最新国产在线视频 | 亚洲国产成人精品青青草原100 | 国产91精品一区二区 | 免费99热在线观看 | 欧美在线成人午夜影视 | 狠狠色综合久久久久尤物 | 四虎传媒 | 离线枕边人国语在线影视 | 一本大道香蕉高清久久 | 国产欧美日韩亚洲 | 女老师3韩国 | 国产一区自拍视频 | 狠狠夜夜| 99热香蕉| 性欧美高清精品videos | 欧美1314www伊人久久香网 | 精品一成人岛国片在线观看 | 69视频在线是免费观看 | 一区视频在线 | 天天噜噜日日噜噜久久综合网 | 在线观看国产精品日本不卡网 | 欧美一区二区三区不卡 | 视频一区二区三区欧美日韩 | 亚洲综合第一页 | 国产一区二区三区成人久久片 | 中文字幕乱码人成乱码在线视频 | 中文一级国产特级毛片视频 | 国产97公开成人免费视频 | 亚洲欧美一区二区久久 | 激情欧美一区二区三区 | 国产人成精品午夜在线观看 | 欧美二区在线观看 | 香蕉久久精品国产 | 精品卡通动漫在线观看视频一区 | 国产欧美精品一区二区三区四区 | 最近最新2019中文字幕6 | 国产成人精品一区二三区在线观看 | 亚洲欧美综合一区二区三区四区 | 色噜噜狠狠色综合久 |