日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5365

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 黄色高清视频网站 | 99热成人精品国产免男男 | 国产一级二级在线观看 | 国产成人久久精品激情 | 久久99精品久久久久久牛牛影视 | 欧美成人免费xxx大片 | 国产免费卡一卡三卡乱码 | 免费视频一区二区性色 | 逼水直流 | 五月天婷婷色 | 久久久国产精品免费看 | 亚洲综合亚洲综合网成人 | 欧美日韩乱妇高清免费 | 国产精品久久久久久影院 | 国产成人啪一区二区 | 久久国产免费福利资源网站 | 亚洲国产成人精品区 | 成品人app下载官网 成品人app软件下载 | 日本不卡视频免费 | 妈妈的朋友们3线在线观看 妈妈的朋友伦理在线观看 妈妈的朋友伦理片在线观看 | 免费一级毛片无毒不卡 | 亚洲国产日韩在线 | 99精品国产综合久久久久五月天 | 手机看片久久国产免费不卡 | 亚洲爱爱天堂 | 欧美做a一级视频免费观看 欧美做a欧美 | 亚洲一区二区三区欧美 | 精品视频一区二区三区四区 | 五月天久草 | 91网站入口 | 欧美一级www | 国产成人看片免费视频观看 | 国产中文字幕免费观看 | 明星换脸高清一区二区 | 毛片免费观看的视频在线 | 国产日韩高清一区二区三区 | 色天天综合色天天碰 | 天天se天天cao综合网蜜芽 | 日日日视频 | 国产精品高清久久久久久久 | 色婷婷久久久swag精品 |