日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces

Time:[2015-8-1]  Hits:5756

Guangzhou Steel teach you: connection handling, processing and Steel Works conflict face pieces


1, the connector bolt hole according to relevant provisions of Chapter 8 of this specification for processing, precision bolt hole wall roughness appearance, diameter and pitch tolerance and so on, Guangzhou steel should be consistent with existing national standards "Steel Construction Quality Acceptance "of the relevant provisions of GB50205.
2, bolt hole pitch over the provisions of this Code section 7.2.1 of the allowable error, the base material can be used to match the welding electrodes, and shall be subject to the system after re-qualified NDT holes, each hole by welding Number of re-drilling must not exceed 20% of the group the number of bolts.
3, high strength bolts conflict face contact surface voids due to the thickness tolerances and other manufacturing error or installation error occurs, provisions for processing in accordance with Table 7.2.3.
4, conflict bolts connecting surface treatment process can be selected at the design according to the requirements of the anti-slip coefficient, anti-slip coefficient should fit the design requirements. When using hand-grinding wheel, grinding direction should be perpendicular to the direction of the force and scope should not be less than 4 times grinding bolt aperture.
5, the high strength bolts connecting process after the appearance of a conflict surfaces, should be consistent with the following provisions:
(1) a connection collision surface should be dry and clean, should not have flash, burrs, weld spatter, burr, iron skin, dirt and so on;
(2) Conflict surface after treatment should take protective measures, shall be marked in conflict face;
(3) Conflict surface with rust treatment, before installation should be fine wire brush perpendicular to the direction of the force member removed rust conflicts surface. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 最新更新国内自拍视频 | α片免费 | 中文字幕亚洲欧美日韩不卡 | 国产在线色 | 国产高清在线免费观看 | 亚洲综合校园春色 | 日韩手机在线视频 | 日本高清中文字幕 | a级日韩乱理伦片在线观看 a级片免费在线播放 | 亚洲va在线观看 | 日本高清不卡在线观看 | 欧美日本视频在线观看 | 极品色在线精品视频 | 这里只有久久精品 | 亚洲激情综合 | 黄图视频在线观看 | 另类在线 | 亚洲国产成人私人影院 | 欧美一级在线观看视频 | 国产在线h视频 | 自拍中文字幕 | 黑人巨大人精品欧美三区 | 青青青手机视频在线观看 | 日韩毛片在线免费观看 | 国产激情在线观看 | 99r精品在线 | 中国一级毛片特级毛片 | 日韩欧美不卡一区二区三区 | 几把好大 | 日韩在线观看第一页 | 久久99精品久久久久久h | 真实国产乱视频国语 | 99这里只有精品视频 | 视频一区二区三区自拍 | 精品视频免费播放 | 老司机免费精品视频 | 国产一区二区三区欧美精品 | 国产综合91天堂亚洲国产 | 精品国产品香蕉在线观看75 | 国产黄色在线观看 | 国产成人久久久精品毛片 |