日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.sowiz.com.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4687

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 久久黄色免费网站 | 欧美一级视频在线高清观看 | 一级全黄毛片 | 手机免费黄色网站 | 精品国产第一国产综合精品 | 国产香蕉视频在线观看 | 国产一级理论片 | 久久国产免费福利永久 | 精品亚洲欧美高清不卡高清 | 欧美成人在线免费观看 | 亚洲国产精品欧美日韩一区二区 | 欧美一区2区三区3区公司 | 欧美片在线观看 | 久久综合九色综合欧洲 | 欧美大片在线免费观看 | 色欧美亚洲 | 国产99视频精品免费视频7 | 国产在线91区精品 | 四色成人网 | 久久国产精品超级碰碰热 | 最近最新2019中文字幕6 | 魏璎珞电视剧免费观看 | 国产成人亚洲精品2020 | 五月天色综合 | 国产免费一区二区 | 一级特黄aaa大片免费看 | 日韩高清在线二区 | www色视频| 亚洲国产一区在线精选 | 亚洲成人毛片 | 午夜视频在线免费播放 | 国产视频网站在线 | 天堂网www天堂在线网 | 日韩在线1 | 欧美日韩精品一区二区 | 最新精品国偷自产在线91 | 杰罗德游戏在线观看完整版免费 | sss亚洲国产欧美一区二区 | 天堂网. www在线资源 | 最新欧美精品 | 免费一区二区三区久久 |