日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel specify the contents of the convergence of high strength bolts
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:[email protected]
  • URL:http://m.sowiz.com.cn

Guangzhou Steel specify the contents of the convergence of high strength bolts

Time:[2015-5-20]  Hits:4836

Guangzhou Steel specify the contents of the convergence of high strength bolts


1, anti-slip coefficient is one of the main planning parameters of convergence of high strength bolts, directly affect the bearing capacity member, and therefore member friction surface treatment regardless of the manufacturer, or by the on-site treatment should be tested against the slip coefficient measured anti-slip coefficient planning requirements of this section shall comply with the minimum mandatory provision.
In the field portion of the device chosen grinding wheel friction surface, grinding range of not less than four times the bolt aperture, grinding direction should be perpendicular to the direction of the force member.
In addition to planning the choice of friction coefficient is less than equal to 0.3, and clearly may not be anti-slip coefficient test persons, the rest of the production situation in order to determine the processing method of the friction surface, you must press the required quantities and by three sets of the same material, the same processing method The specimen retest. At the same time along with three sets of the same material, the same specimen processing method for the device before the reinspection.
2, high strength bolts final tighten 1h, missing bolt pretension has been largely concluded, in the next one or two days, losing stabilized, after more than a month, the loss will stop, but in the external environment, bolts torque coefficient will change, affecting the accuracy of the inspection outcome. In order to unify and ease of operation, this provision must end at the same time checking within 1h after 48h.
3, the structure of this section refers to the planning reason reason causing space is too small to use a dedicated end wrench tighten conditions in torsional shear type high strength bolts of construction, because device sequentially, means the direction of ill-considered, or twist at the end because of the electric wrench to grasp the unskilled. Resulting in a final twist when the tail end of the ridge head Plum slip teeth (ie slip), you can not twist off the plum head, resulting in a final twist torque is unknown. Should be controlled to a certain percentage of these bolts.
4, the beginning of high strength bolts screwed screwed for the purpose of re-friction surface energy of tight and uniform bolt stress, focusing on large node node device order to prevent the loss of pre-tension bolts uneven impact of the convergence of stiffness.
5, forced penetration will damage the threaded bolt, changing the convergence deputy high strength bolts torque coefficient, and even the nuts are not screwed on, so focus on the freedom to penetrate bolt holes, gas cutting reaming very rules, both impair effective member carrying surface, reducing the pressure force transmission area, but also to cause defects reaming at the steel, it shall not gas cutting reaming, reaming maximum limits on the amount is based on the effective load transfer surface member and the friction force area of ​​consideration.
6, for bolt-node grid, its stiffness (deflection) are often weaker than planned value, an important reason is because the ball and the steel bolt tightening is not strong convergence of high-strength bolts, a gap, loosening not tightened conditions, the current portion After removal of the support system, due to the convergence gap, loose and other reasons, deflection significantly increased, exceeding specification limits. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲欧美精品成人久久91 | 精品国产自在在线在线观看 | 香蕉69精品视频在线观看 | 亚洲精品永久免费 | 卡一卡二卡三免费的视频 | hh99me福利毛片在线看 | 大量国产激情视频在线观看 | 亚洲一区免费在线 | 欧美手机在线观看 | 草逼免费 | 奇米精品一区二区三区四区 | 亚洲男人的天堂成人 | 欧美日韩国产在线人成app | 精品亚洲欧美中文字幕在线看 | 香蕉视频啊啊啊 | 国产高清毛片 | 日日操夜夜操狠狠操 | 高清视频 一区二区三区四区 | 91人人在线| 色播在线视频 | 亚洲国产精品一区二区三区久久 | 亚洲国产精品欧美综合 | 日本高清免费中文字幕不卡 | 国产一级二级三级在线观看 | 亚洲欧美日韩在线播放 | 色猫咪av在线网址 | 粉嫩极品国产在线播放 | 久色免费视频 | 欧美香蕉爽爽人人爽观看猫咪 | 国产成人精品一区二区 | 四虎永久在线精品波多野结衣 | 亚洲第一夜 | 欧美日韩视频在线一区二区 | 国产自产c区 | 麻豆制片厂制作传媒在现观看 | 精品57页国产100页 | 天天干天天色综合网 | 国产精品k | 日韩孕妇孕交在线视频 | 尹人久久久香蕉精品 | 久久免费高清视频 |