1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5005

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产精品国产精品国产三级普 | 亚洲欧美在线精品一区二区 | 国产剧情自拍 | 日韩一区二区不卡 | 国产韩国精品一区二区三区 | 美女三级网站 | 日本在线免费播放 | 欧美亚洲综合视频 | 亚洲色在线视频 | 深爱五月综合网 | 91在线视频免费观看 | 色视频免费在线 | h版肉动漫在线观看网站 | 日本免费成人网 | 99热这里只 | 日本高清色www网站色 | 国内精品久久影视 | 久久精品蜜芽亚洲国产a | 国产a视频精品免费观看 | 国产欧美日韩一区二区三区 | 国产真实伦对白全集视频 | 久久99精品国产麻豆宅宅 | 在线天堂新版在线观看 | 蜜臀首页| 国产精品入口麻豆高清 | 国产午夜精品一区二区三区小说 | 欧美影院在线观看在线观看看 | 四虎永久免费地址在线网站 | 一区在线视频 | 久草小视频 | 亚洲欧美一区二区三区在线 | 成年人网址在线观看 | 诱咪视频免费 | 日韩欧美一二区 | 性激烈欧美三级在线播放 | 在线免费观看h视频 | 国产高清在线免费 | 欧美精品免费线视频观看视频 | 国产欧美高清 | 99久久中文字幕伊人情人 | 久久国产亚洲精品麻豆 |