日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5082

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 干干干操操操 | 99热国品| 五月天综合社区 | 成品人app软件大全下载免费版 | 欧美三级不卡在线观看视频 | 国产magnet | 最近高清中文国语在线观看 | 2023亚洲男人天堂 | 欧美日韩一区二区三区视视频 | 欧美成人中文字幕 | 精品国产a | 亚洲精品麻豆 | 久久女 | 欧美黑人巨大性极品hd欧 | 国产精品大全国产精品 | 日本三级黄视频 | 四虎精品影视 | 久9这里精品免费视频 | 欧美日韩国产高清一区二区三区 | 国产成人精品福利色多多 | 久久99热只有视精品6国产 | 国产福利免费在线观看 | 国产精品玖玖玖在线观看 | 色网站在线视频 | 青青草国产一区二区三区 | 青青草久久伊人 | 无限视频免费观看网 | 亚洲国产二区三区久久 | 自拍视频在线观看完整版 | 欧美三级超在线视频 | 九九九热在线精品免费全部 | 久久久久逼 | www福利视频 | 三级欧美日韩 | 一级爱爱片一级毛片-一毛 一级a爰片久久毛片 | 日本人在线看片 | 国产91精品久久久久久 | 福利社在线免费观看 | 91情侣在线视频 | 日本高清在线视频www色下载 | 亚洲丰满熟妇毛片在线播放 |