Steel works construction schedule control content

Time:[2014-11-15]  Hits:5592

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 91精品久久久久久久99蜜桃 | 国产麻豆精品 | 福利网站污| 亚洲免费色视频 | 啪一啪在线视频 | 在线免费观看福利 | 欧美精品一区二区久久 | 99国产精品一区二区 | 手机在线免费不卡一区二 | 香蕉视频在线观看www | 国产一级在线视频 | 四虎.coms3u8| 免费看的黄色网址 | 日本免费黄网 | 小嫩嫩12欧美| 欧美日韩麻豆 | 日韩在线无 | 亚洲成人激情在线 | 亚洲欧美日韩国产综合久 | 天堂婷婷 | 甜甜的肉禽系统小说娱乐圈 | 天美麻豆国产传媒免费视频 | 成人精品一区二区www | 日本免费a视频 | 久久久婷婷 | 五房色播 | 啪啪伊人网 | 毛片官网 | 亚洲一级在线观看 | 456成人网 | 精品亚洲欧美高清不卡高清 | 看片不卡 | 羞羞的视频免费看 | 三级毛片在线免费观看 | 欧美成人h版白雪公主 | 火影忍者纲f手黄漫acg | 欧美日韩亚洲国内综合网香蕉 | 99在线在线视频免费视频观看 | 免费无限制观看黄的网址 | 在线观看国产免费高清不卡 | 精东传媒 果冻传媒 |