日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:5121

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 亚洲欧美视频二区 | 麻豆国产在线观看免费 | 国产一在线精品一区在线观看 | 九九视频只有精品六 | 欧美亚洲国产另类 | 在线视频亚洲欧美 | 久爱www成人网免费视频 | 久久永久免费 | 91精品最新国内在线播放 | 天天摸天天舔天天操 | 国产精品久久久久免费视频 | 99re在线观看 | 日韩毛片免费在线观看 | 最新欧美精品一区二区三区不卡 | 妇乱子伦激情 | 午夜精品在线免费观看 | 亚洲精品在线影院 | 巨人万梓良国语免费观看 | 国产一区二区三区欧美精品 | 办公室被老板调教bd | 黄色免费高清视频 | 欧美麻豆久久久久久中文 | 四虎网址在线观看 | 日韩精品欧美精品中文精品 | 手机国产日韩高清免费看片 | 成人免费视频网站 | 国内亚州视频在线观看 | 韩国福利一区二区美女视频 | 国产日韩精品欧美一区视频 | 欧美一二三区视频 | 午夜视频在线观看一区二区 | 国产3级在线观看 | 色99在线| 国产精品久久久久有声小说 | 手机看片国产免费现在观看 | 午夜网站在线观看免费网址免费 | 牛牛视频在线观看 | 欧美日韩91 | 国产999视频 | 手机国产精品一区二区 | 欧美一区二区三区视频在线 |