Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2378

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 麻豆精品传媒一二三区在线视频 | 国产欧美一区二区三区在线看 | 四虎影院紧急入口 | 九九热精品视频 | 国产福利小视频在线播放观看 | 青草视频免费观看在线观看 | 四虎影院欧美 | 成人午夜免费视频 | 国产青青草视频 | 视频国产91 | 91人人在线| 青青草国产精品欧美成人 | 神兵小将第一部 | 在线观看人成网站深夜免费 | 四虎影视国产精品亚洲精品hd | 特级毛片在线观看 | 二区国产 | 欧美成人久久一级c片免费 欧美成人久久久免费播放 欧美成人精品在线 | 99re最新地址获取精品 | 大胸年轻的搜子4理论 | 99久久国产综合精品麻豆 | 日本大片成人免费播放 | 在线一区视频 | 日本在线观看永久免费网站 | 久久综合九色综合桃花 | 青青青国产免费 | 国产精品久久福利网站 | 天堂网在线.www天堂在线 | 免费污污视频网站 | 99精品欧美一区二区三区 | 麻豆精品国产免费观看 | 日韩欧美精品中文字幕 | 国产一级特黄在线视频 | 草久影院 | 欧美日本亚洲国产一区二区 | 久久精品一区二区三区中文字幕 | 精品99久久 | 国产精品国产三级国产a | 一级片免费在线 | 青青草国产精品久久 | 国产精品午夜寂寞视频 |