Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2638

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 丁香五月网久久综合 | 韩日免费视频 | 国产第5页| 亚洲天堂男人的天堂 | 窝窝免费午夜视频一区二区 | 天堂在线网站 | 久久综合色之久久综合 | 国产3区| 亚洲天堂男人网 | 精品福利一区二区三区 | 欧美成人午夜不卡在线视频 | 精精国产www视频在线观看免费 | 国产自产拍精品视频免费看 | 久久精品国产99久久99久久久 | 麻豆国产传媒片在线看 | 国产精品高清久久久久久久 | 国产精品露脸张开双腿 | 色婷五月| 美日韩一级 | av女同| 亚洲高清免费 | 四虎影视在线麻豆国产 | 欧美亚洲尤物久久精品 | 国产网爆门 | 免费5xx | 亚欧三级| 欧美一区二区三区视频在线观看 | 国产精品页| 在线视频观看国产 | 欧美日韩视频免费播放 | 成人手机在线观看 | 99精品热视频 | a性片 | 四虎影视在线看免费完整版 | 亚洲视频 在线观看 | 欧美激情一区二区三区不卡 | 免费女人18a级毛片视频 | 四色网站 | 综艺免费观看综艺大全在线观看 | 国产精品一国产精品免费 | 国产一级一片免费播放 |