日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Main reinforcement construction methods of steel workshop building reinforcement
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.sowiz.com.cn

Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2360

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 国产高清视频在线 | 欧美日本在线视频 | www.香蕉视频在线观看 | 国产123| 亚洲欧美日韩高清一区二区三区 | 久草精品免费 | 可以免费看污片的网站 | 国产精品观看视频免费完整版 | 青青青国产 | 日本一区二区不卡视频 | 成人国产精品一区二区网站 | 久久99免费| a天堂中文在线官网 | 欧美黑人成人免费全部 | 国内精品久久久久久久97牛牛 | 97在线播放 | 菠萝蜜在线视频观看 | 女性爽爽影院免费观看麻豆 | 男人的天堂久久 | 日本一区二区三区不卡在线视频 | 一二三四免费视频社区 | 久久成人福利视频 | 国产高清福利91成人 | 第一福利视频 | 色婷婷视频 | 成年人在线观看网站 | 黄色成人在线播放 | 国产最新自拍 | 欧美一进一出抽搐大尺度视频 | 日韩中文字幕在线观看视频 | 欧美成人久久一级c片免费 欧美成人久久久免费播放 欧美成人精品在线 | 国产高清在线观看麻豆 | 91久久福利国产成人精品 | 久久久男人天堂 | 天天爆操 | 欧洲欧美成人免费大片 | 两个人在线观看完整版 | 成人午夜精品网站在线观看 | 免费色网站 | www亚洲欲色成人久久精品 | 日韩欧美国产中文 |